Interactive ROI Calculator

Enter your parameters to see estimated cost savings

Your Data Center Parameters

Total IT equipment power consumption
Your electricity rate per kilowatt-hour
Your existing data center PUE (typical: 1.5-2.0)

Your Projected Savings

₹0
Annual Energy Cost Savings
0%
Energy Cost Reduction
0
CO₂ Reduction (tonnes/year)
0
Estimated Payback Period

Cost Breakdown Comparison

Traditional Air-Cooled
IT Power: -
Cooling Power: -
Total Power: -
Annual Cost: -
VISARJ DCBx
IT Power: -
Cooling Power: -
Total Power: -
Annual Cost: -

Reference Deployment Options

Edge

Single 42U Pod

100 kW
Configuration: 1× 42U DCBx Pod
Footprint: 2.5 sq m
Deployment: 8 weeks
PUE: 1.05-1.16

Perfect for edge computing, remote sites, and distributed infrastructure requiring high-density computing in minimal space.

Enterprise

1MW Data Center

1 MW
Configuration: 10× 42U DCBx Pods
Footprint: 25 sq m
Deployment: 12 weeks
PUE: 1.05-1.16

Enterprise-grade deployment for AI training, HPC, hyperscale cloud, and high-density computing applications.

Environmental Impact

VISARJ DCBx contributes to a sustainable future

Zero Water Consumption

Traditional data centers consume millions of liters of water for cooling. VISARJ immersion cooling uses zero water.

Save up to 30,000 liters/kW/year

Reduced Carbon Footprint

40-50% energy savings translate directly to reduced CO₂ emissions and environmental impact.

~0.7 kg CO₂ saved per kWh

Extended Hardware Life

Lower operating temperatures extend equipment lifespan, reducing e-waste and resource consumption.

20-30% longer hardware life

Real-World Results

AI Research

Leading Research Institution

400 kW in 30 sq m
1.06 PUE achieved
₹1.2 Cr Annual savings

Deployed 4× 42U pods for AI training, achieving unprecedented GPU density and 45% reduction in training time costs.

Telecom

National Telecom Operator

50 Sites 12U pod each
10 Weeks Full rollout
80% Lower deployment cost

Rapid deployment of edge infrastructure for 5G services across remote locations with minimal facility requirements.

Government

State eGovernance Initiative

15 Districts 24U pods
50% Energy savings
5M Citizens served

District-level data centers serving digital government services with sustainable, cost-effective infrastructure.

Ready to Realize These Savings?

Our team will create a detailed ROI analysis specific to your infrastructure